swh:1:snp:92f3f585b9ae79620ad8c41a332d6329b31fd381
Tip revision: aefc1664da95b73bfb4b3a81026343b28693d531 authored by Mike Stewart on 24 December 2020, 06:58:42 UTC
Comanche 45: implemented a fix for anomaly COM-4 that gives the correct checksums and the correct word count
Comanche 45: implemented a fix for anomaly COM-4 that gives the correct checksums and the correct word count
Tip revision: aefc166
CONTRACT_AND_APPROVALS.agc
### FILE="Main.annotation"
## Copyright: Public domain.
## Filename: CONTRACT_AND_APPROVALS.agc
## Purpose: A section of Comanche revision 044.
## It is part of the reconstructed source code for the
## original release of the flight software for the Command
## Module's (CM) Apollo Guidance Computer (AGC) for Apollo 10.
## The code has been recreated from a copy of Comanche 055. It
## has been adapted such that the resulting bugger words
## exactly match those specified for Comanche 44 in NASA drawing
## 2021153D, which gives relatively high confidence that the
## reconstruction is correct.
## Assembler: yaYUL
## Contact: Ron Burkey <info@sandroid.org>.
## Website: www.ibiblio.org/apollo/index.html
## Mod history: 2020-12-03 MAS Created from Comanche 51.
## 2020-12-05 MAS Changed name to COLOSSUS 2 and dates to
## approximate Comanche 44 release date.
## Page 1
# ************************************************************************
# * *
# * THIS AGC PROGRAM SHALL ALSO BE REFERRED TO AS: *
# * *
# * *
# * COLOSSUS 2 *
# * *
# * *
# * THIS PROGRAM IS INTENDED FOR USE IN THE CM AS SPECIFIED *
# * IN REPORT R-577. THIS PROGRAM WAS PREPARED UNDER DSR *
# * PROJECT 55-23870, SPONSORED BY THE MANNED SPACECRAFT *
# * CENTER OF THE NATIONAL AERONAUTICS AND SPACE *
# * ADMINISTRATION THROUGH CONTRACT NAS 9-4065 WITH THE *
# * INSTRUMENTATION LABORATORY, MASSACHUSETTS INSTITUTE OF *
# * TECHNOLOGY, CAMBRIDGE, MASS. *
# * *
# ************************************************************************
# SUBMITTED: MARGARET H. HAMILTON DATE: 8 FEB 69
# M.H.HAMILTON, COLOSSUS PROGRAMMING LEADER
# APOLLO GUIDANCE AND NAVIGATION
# APPROVED: DANIEL J. LICKLY DATE: 8 FEB 69
# D.J.LICKLY, DIRECTOR, MISSION PROGRAM DEVELOPMENT
# APOLLO GUIDANCE AND NAVIGATION PROGRAM
# APPROVED: FRED H. MARTIN DATE: 8 FEB 69
# FRED H. MARTIN, COLOSSUS PROJECT MANGER
# APOLLO GUIDANCE AND NAVIGATION PROGRAM
# APPROVED: NORMAN E. SEARS DATE: 8 FEB 69
# N.E. SEARS, DIRECTOR, MISSION DEVELOPMENT
# APOLLO GUIDANCE AND NAVIGATION PROGRAM
# APPROVED: RICHARD H. BATTIN DATE: 8 FEB 69
# R.H. BATTIN, DIRECTOR, MISSION DEVELOPMENT
# APOLLO GUIDANCE AND NAVIGATION PROGRAM
# APPROVED: DAVID G. HOAG DATE: 8 FEB 69
# D.G. HOAG, DIRECTOR
# APOLLO GUIDANCE AND NAVIGATION PROGRAM
# APPROVED: RALPH R. RAGAN DATE: 8 FEB 69
# R.R. RAGAN, DEPUTY DIRECTOR
# INSTRUMENTATION LABORATORY